Allones 2 - Pays de la Loire

The former Allones 2 landfill was unsuitable for building purposes. It was filled in and the ground-mounted photovoltaic plant is built over 6.2 hectares. The panels are secured to single-axis horizontal solar trackers that increase the PV plant’s production by up to 25%, compared with fixed arrays. The tracker system enables the modules to follow the sun’s path throughout the day, from East to West, with tracking accuracy of 1°.

12000
de surface
2514 kW
de puissance totale
980 foyers
fournis en électricité
1414 Tonnes
de CO² économisé par an

Voir aussi...

Voir l'installation

Chaponost

Rhône-Alpes 1500 kW
Voir l'installation

Moissac

Midi-Pyrénées 250 kW
Voir l'installation

Valreas

Provence-Alpes-Côte-d'Azur 1749 kW
Voir l'installation

Brindas

Rhône-Alpes 100 kW
Voir l'installation

Saint Didier 1

Provence-Alpes-Côte-d'Azur 100 kW
Voir l'installation

Noves 3

Provence-Alpes-Côte-d'Azur 250 kW
Voir l'installation

Saint Martin de Crau

Provence-Alpes-Côte-d'Azur 100 kW
Voir l'installation

Marmande

Aquitaine 241 kW
Voir l'installation

Allones 1

Pays de la Loire 4486 kW
Voir l'installation

Moissac

Midi-Pyrénées 250 kW
Voir l'installation

METHELEC

Auvergne Rhône Alpes 1560 kW
Voir l'installation

Noves 2

Provence-Alpes-Côte-d'Azur 250 kW
Voir l'installation

Noves 2

Provence-Alpes-Côte-d'Azur 250 kW
Voir l'installation

Pont Saint Esprit 1

Provence-Alpes-Côte-d'Azur 345 kW
Voir l'installation

Brue Auriac

Provence-Alpes-Côte-d'Azur 100 kW
Voir l'installation

Chassier

Rhône-Alpes 100 kW